EGYpt

AL DABAA 220/66/22kV

Al Dabaa 220/66/22 kV is a power infrastructure project supporting reliable electricity transmission and distribution. The project’s voltage levels help connect the high-voltage network with regional and local supply systems. The result is infrastructure built to support the area’s growing energy needs.

  • Voltage Level: 220/66/22 kV 
  • Type: GIS
  • Date: 2020

The El Mahmudia Power Plant project is associated with a 330 MW electricity generation facility. Its capacity is intended to contribute to a stable and dependable power supply.
The project brings together the systems and infrastructure needed for plant operations. Planning and coordination support efficient integration with the wider energy network.

  • Capacity: 330MW
  • Simple Cycle
  • Date: 2014

The Toshka 220/66/22 kV project supports the connection of high-voltage transmission to lower-voltage networks.
Its multiple voltage levels help deliver power across different parts of the electrical system.
The project is planned to support reliable operation and efficient distribution.

  • Voltage Level : 220/666/22kV
  • Type : GIS
  • Date: 2021

The Dandara project brings together high-voltage infrastructure and 33 kV network connections. It is intended to support dependable power delivery to the connected network. The project’s configuration helps link transmission capacity with distribution requirements.

  • Voltage Level: 220/33/33kV
  • Type AIS
  • Date : 2026

The Manshiet Nasser 220/66/11 kV project links transmission and distribution across three voltage levels.
Its configuration supports the delivery of electricity from the high-voltage network to local supply systems. Coordination across the voltage levels helps support stable network performance. It provides infrastructure to meet the area’s electricity supply needs.

  • Voltage Level: 220/66/11kV 
  • Type: GIS
  • Date : 2013
AL SHABAB Extension 66kV

The Al Shabab 66 kV Extension project expands existing electrical infrastructure to support network needs.
It is designed to strengthen power distribution and improve supply reliability.
The project helps prepare the network for future demand.

  • Voltage Level: 66 kV 
  • Type: GIS
  • Date: 2018

The El Massaied 220 kV Extension project supports the expansion of high-voltage network infrastructure.
It is intended to improve the transfer of electricity across the connected grid.
The extension is designed to integrate with existing facilities and network operations.

  • Voltage Level: 220kV
  • Type: GIS
  • Date: 2026

The Al Dabaa 220 kV Extension project adds capacity to the area’s high-voltage network. It is designed to support reliable electricity transmission and grid expansion. The extension works alongside existing infrastructure to strengthen network connectivity. Safety, quality, and operational readiness are central to project delivery.

  • Voltage Level: 220kV
  • Type: GIS
  • Date : 2026

The Lina Farm 66/22 kV project supports power supply infrastructure for the farm and its connected loads.
It connects a 66 kV supply level with a 22 kV distribution network.
The design aims to provide dependable electricity for ongoing operations.

  • Voltage Level: 66/22kV
  • Type: AIS
  • Date: 2012

Pre-fabricated power modules provide integrated electrical infrastructure for oil and gas facilities. Their modular design supports efficient installation and coordinated site delivery. The modules can bring essential power systems together in a compact, organized format.

  • Voltage Level: 11kV
  • Type : Cubical AIS
  • Date: 2015

Iraq

4 x 125 MW DIWANIA P. Plant

The Diwania Power Plant project is designed around four generating units, each with a capacity of 125 MW.
Together, these units provide a total planned capacity of 500 MW.
The project supports electricity generation and contributes to the wider power supply network.

  • Capacity: 4x125MW
  • Type: Simple Cycle
  • Date: 2013

tanzania

6 Portable substations 33/11kV

This project involves six portable substations designed to operate at 33/11 kV.
Their portable format supports flexible deployment where power network needs may change.
Each substation connects a 33 kV supply level to an 11 kV distribution network.

  • Voltage Level: 33/11kV
  • type: AIS / Cubical AIS
  • Date: 2016

USA

Walnut Creek 135/15kV

The Walnut Creek 135/15 kV project supports the connection between high-voltage supply and local distribution.
Its voltage configuration steps power down from 135 kV to 15 kV.
The project is designed to strengthen network capacity and support dependable electricity delivery.

  • Voltage Level: 135/15kV
  • Type AIS
  • Date 2011